Project Name: South pars Water treatment plant project
Location: Asalouyeh, Bushehr Province
Capacity: 3*45 M3/hr water treatment
Scope of Work: This project consist of four different plant: demin water production, potable water production, service water production, and chemical sources.
The demin water system consists of three units with a capacity of 45 m3/hr for each unit. The potable water is consisted of two units with a capacity of 90 m3/hr for each unit and the service water system is consisted of two units with a capacity of 30 m3/hr for each unit.
Type of Contract: EPC
Client: MAPNA
Contractor(s): Kherad Engineering Company (KEC)
Commencement Date: July 1999
Ending Date: 2001