Project Name: New Painting Workshop Project of Saipa Company’s Development Plan
Location: Tehran province
Capacity: 90 m3/hr of demin water
Scope of Work: The said plant has a capacity of raw water treatment with an output of 90 m3/hr of demin water with electrical conductivity less than 10µs/cm.
Pre-treatment unit this division is inclusive of two sand filter tanks and one activated carbon tanks, as well as piping and chemical injection units.
Demin Water Treatment unit, Reverse osmosis (R.O) method was designed and implemented. water. Treatment operation is to be done automatically through the related electrical panel. and Demin Water Storage Units This unit has two storage tanks; each has a capacity of 79m3 and are inclusive of operation systems and transferring demin water to user units.
Type of Contract: EP
Client: Saipa Company
Contractor(s): Kherad Engineering Company (KEC)
Commencement Date: May 2000
Ending Date: February 1999