Project Name: Khatoon Abad copper smelter Water Treatment Plant.
Location: Kerman Province
Capacity: 35 M3/hr water treatment
Scope of Work: This water treatment plant, with a capacity of 35m3/hr , is to supply required water for steam boiler of Khatoon Abad copper melting project. The method of treatment is on exchange and conductivity of output water is 0.1µs.This project is being performed in province of Kerman and is consisted of two production lines , either of them have the above mentioned capacity.
Type of Contract: EPC
Client: National Iranian Copper Industry Co.
Contractor(s): Kherad Engineering Company (KEC)
Commencement Date: July 2000
Ending Date: Year 2003