Developing a Water Treatment plant for Montazer-Ghaem Power plant

Project Name: Developing a Water Treatment plant for Montazer-Ghaem Power plant

 

Location: Karaj, Alborz province  

 

Capacity: 2 × 60 m3/hr.

 

Scope of Work: This was a turnkey project to design, manufacture, erection and commissioning of a water treatment system for Montazer-Ghaem power plant in Karaj. The plant is consisted of two lines each has the capacity for treating 60 cubic meters per hour (2*60m3/hr.) of water achieving the electrical conductivity of 0.1 micro-Siemens/cm2.

 

Type of Contract: EPC

 

Client: Mapna

 

Contractor(s): Kherad Engineering Company (KEC)


Commencement Date:  September 1996
 

Ending Date: October 1999