Project Name: Developing a Water Treatment Plant for Khark Methanol Enterprise
Location: Khark Island, Bushehr province
Capacity: 3*170 M3/hr
Scope of Work: This was a project of developing a condensate polishing system for methanol enterprise
In Khark Island. The plant is consisted of three lines, each having a capacity treating 170
M3/hr of condensate achieving the electrical conductivity of 0.2 microsiemens/ cm2.
The plant also includes a package production sodium hypochlorite from seawater with the capacity equal to 50-kg chlorine per hour.
Type of Contract: EPC
Client: Petrochemical Industries Design & Engineering Company. (PIDEC)
Contractor(s): Kherad Engineering Company (KEC)
Commencement Date: 1996
Ending Date: 1999