Project Name : Cheshmeh Khosh unit expansion project
Location : Cheshmeh Khosh, Eelam Province
Scope of Work : Project was including below packages:
Eight new streamlines and manifold extension. Revamping existing Bank A with new instrument and DCS, supply and erection new production bank B & C for salty oil and salty sour oil respectively
Gas gathering piping inside production unit
Three stages gas flares and flare knock out drums
61000 BPD main oil pump
Fire water system including storage tank, electrical and diesel pumps, jockey pump
Complete piping and instruments for production unit
DCS, ESD and F & G systems
9 KM Water pipeline
Drinking water package
Type of Contract : EPC
Client : Iranian Central Oil Fields Company
Contractor(s) : Kherad Engineering Company (KEC)
Commencement Date: Apr. 2006
Ending Date: Varies with respect to production schedule Degassing and production tank Feb. 2007
Bank B production: Aug. 2008 , Inlet manifolds Dec. 2009
Bank C production: Mar. 2011 , Main oil pumps: Mar. 2011